home *** CD-ROM | disk | FTP | other *** search
/ Ron Blank & Associates 7 / Ron Blank & Associates 7.iso / mri07a / mri07a113.jpg < prev    next >
Joint Photographic Experts Group Image  |  2005-02-07  |  81KB  |  680x510  |  16-bit (59,623 colors)
Labels: bulletin board | monitor | reckoner | sky | vegetarianism
OCR: Snow Guard Project Evaluation Checklist For Product Selection Specification Determine what areas are to be protected Determine roof design snow loads in p.s.f. (not ground snow those areas and verify adequacy of building structure Determine vector force of snow from, and roof angle Determine tributary force to each panel from rafter length and panel width Select snow guard product based upon: Metallurgical compatib ility Other comp atibility issues with roof profile (and warranty) Tested Strength Cost- including insta llati ion Aesth etics, including finish matching considerations if applicable Longevity/Durabi ility Continued 113 Testec installation